Jwell HDPE Gas Plastic Pipe Production Equipment for Construction Works

Get high-quality Jwell HDPE Gas Plastic Pipe Production Equipment for Construction Works from our factory. Durable and efficient production machinery.

Request a Quote
  • Jwell HDPE Gas Plastic Pipe Production Equipment for Construction Works
  • Jwell HDPE Gas Plastic Pipe Production Equipment for Construction Works
  • Jwell HDPE Gas Plastic Pipe Production Equipment for Construction Works
  • Jwell HDPE Gas Plastic Pipe Production Equipment for Construction Works
  • Jwell HDPE Gas Plastic Pipe Production Equipment for Construction Works
  • Jwell HDPE Gas Plastic Pipe Production Equipment for Construction Works

PRODUCTS DETAILS

  • Overview
  • Product
  • Company Profile
  • Our Advantages
  • Packaging & Shipping
  • Certifications
  • Exhibitions
  • FAQ
Overview

Basic Info.

Model NO.
JW60/40; JW75/38; JW90/38
Automation
Automatic
Computerized
Computerized
Certification
CE, ISO9001:2008, SGS
Customized
Customized
Condition
New
After-sales Service
1 Year
Keywords
Pipe Machinery
Suitable Material
PE
Usage
Gas Supply
Motor
China Top Brand
Final Product
Plastic Pipe
Contactor
Scheider
Pipe Diameter
63-630mm
Inverter
ABB Brand
Control
PLC+Touch Screen
Packing
Wooden Cases
Advantages
High Quality/High Cost Performance/Good Appearance
Transport Package
Wooden Cases
Trademark
Jwell
Origin
China
Production Capacity
300-1000kg/H

Packaging & Delivery

Package Size
6000.00cm * 3000.00cm * 2500.00cm
Package Gross Weight
10000.000kg

Product Description

Product

Applications

The gas pipeline produced by the production line meets the requirements of GB/T 15558.1, ISO 4437 and G5+ PE001.1-2017 standards, with slow crack growth resistance (SCG≥500h) and fast crack growth resistance (RCP (dn315SDR11, 0ºC) > 10bar), Long-term creep performance (MRS≥10MPa), excellent fusion compatibility, excellent seismic performance, excellent corrosion resistance, has become the preferred product of urban gas pipelines.

Descriptions
Jwell HDPE Gas Plastic Pipe Production Equipment for Construction Works
This production line is a new high speed energy saving pipe extrusion line developed by our company with European advanced technology, which is suitable for high speed extrusion of HDPE pipe. Compared with the ordinary production line, its energy-saving effect reaches about 35%, the production efficiency increases more than 1 times.it not only saves the space and labor cost, but also improves the efficiency. The production line has beautiful appearance, high degree of automation and stable and reliable products.

Specifications

Production line model Pipe size(mm) Extruder model Max.output capacity(kg/h)
JWPE63 Ф20-Ф63 JW60/40 300
JWPE110 Ф20-Ф110 JW60/40 360
JWPE160 Ф50-Ф160 JW60/40 440
JWPE250 Ф75-Ф250 JW75/38 500
JWPE315 Ф110-Ф315 JW75/38 650
JWPE450 Ф200-Ф450 JW90/38 800
JWPE630 Ф315-Ф630 JW90/38 1000

Process Steps
Jwell HDPE Gas Plastic Pipe Production Equipment for Construction Works

Company Profile

Jwell was founded in 1997, China Plastics Machinery Industry Association vice president unit, plastic extrusion equipment, chemical fiber spinning complete sets of equipment manufacturers. The production bases of Jwell company cover about 7,000,000 square meters and are consisted with 7 parts, which are located in Jiading district of Shanghai where the head office of the company locates, Haining and Zhoushan City of Zhejiang Province, Taicang City and Liyang City of Jiangsu Province, Foshan City of Guangdong Province and Thailand. The company has 26 professional companies and nine large-scale gold processing plants and three heat treatment nitriding plants, with an annual output of 3000+ sets of high-grade plastic extrusion production lines and other complete sets of equipment, marketing in more than 120 countries and regions.

Jwell has a high-quality team and an experienced team of mechanical and Electrical Commissioning Engineers, as well as an advanced machining base and Standard Assembly Workshop.

Jwell HDPE Gas Plastic Pipe Production Equipment for Construction Works Jwell HDPE Gas Plastic Pipe Production Equipment for Construction Works Jwell HDPE Gas Plastic Pipe Production Equipment for Construction Works Jwell HDPE Gas Plastic Pipe Production Equipment for Construction Works

Our Advantages

Workshop Processing

Jwell HDPE Gas Plastic Pipe Production Equipment for Construction WorksQuality Control
Jwell HDPE Gas Plastic Pipe Production Equipment for Construction WorksGlobal Service and Training

Jwell HDPE Gas Plastic Pipe Production Equipment for Construction Works

Packaging & Shipping

Jwell HDPE Gas Plastic Pipe Production Equipment for Construction Works

Certifications

Jwell HDPE Gas Plastic Pipe Production Equipment for Construction Works

Exhibitions

Jwell HDPE Gas Plastic Pipe Production Equipment for Construction Works

FAQ

Q1. What about the payment way?
A1. By TT, L/C at sight or Alibaba trade assurance. 30% down payment should be paid after contract is valid, 70% balance should be paid before shipment.

Q2. Installation and stuff training available from you?
A2. Yes, we have rich engineers around the world which can send to your factory and train your workers. Also we can online guide your members.

Q3. How long is the guarantee?
A3. We offer you high quality machines with 12 months guarantee and reply you as soon as possible within 6 hours.

Q4. If the machine some parts is broken one day, how can we get help from you?
A4. We will send you spare parts free of charge If they are in warranty, not including easy-broken parts. For easy-broken parts, we will only charge a cost fee.

Q5.How does your factory do regarding quality control?
A5.We have passed the IS09001:2000 Quality Management System and CE certificate and we have a special QC department in charge of products' quality. If you also need other certificates, we also can help to apply.

Q6. What is your packaging?
A6. Our conventional packaging is: After doing the anti-rust treatment, wrap the plastic film around the machine and then fix the machine on the wooden bracket.

Q7. How can we check the machines before delivery?
A7. We can provide online checking when testing the machine on site. We will take and prepare detailed testing videos for your checking before the delivery. We accept third-party testing. Except above points,we will provide detailed testing report.

Hot Products

HDPE PE 100 High Density Polyethylene Floating Water Mud Slurry Sand Gas Oil Dredging Dredge Dredger Mining Supply Plastic Pipe

HDPE PE 100 High Density Polyethylene Floating Water Mud Slurry Sand Gas Oil Dredging Dredge Dredger Mining Supply Plastic Pipe

DN20-1200 HDPE Water Supply Pipes Black PE100 SDR 17 Plastic Pipe ISO Standard

DN20-1200 HDPE Water Supply Pipes Black PE100 SDR 17 Plastic Pipe ISO Standard

PE Pipe PE80/100 HDPE Pressure Pipe SDR11 for Water Supply/Fire Fighting/Gas Transport

PE Pipe PE80/100 HDPE Pressure Pipe SDR11 for Water Supply/Fire Fighting/Gas Transport

HDPE Drainage and Water Supply Pipe High Pressure PE Plastic Tube Pressure Pipes

HDPE Drainage and Water Supply Pipe High Pressure PE Plastic Tube Pressure Pipes

Virgin New Material Black Pipe with Blue Stripe HDPE Pipe for Water Supply

Virgin New Material Black Pipe with Blue Stripe HDPE Pipe for Water Supply

High Quality PE HDPE Plastic Water Supply Pipe

High Quality PE HDPE Plastic Water Supply Pipe

Farm HDPE Water Supply Pipe Polyethylene Drainage Sewage Pipe

Farm HDPE Water Supply Pipe Polyethylene Drainage Sewage Pipe

PE100 HDPE Tube HDPE Pipe Dredging Discharge Pipes Water Pipe for Water Supply Irrigation Mining Construction

PE100 HDPE Tube HDPE Pipe Dredging Discharge Pipes Water Pipe for Water Supply Irrigation Mining Construction

PE Pipe / HDPE Pipe for Water Supply

PE Pipe / HDPE Pipe for Water Supply

HDPE Electro Fusion Fitting for Water Supply and Drainage Pipe Fittings Accessories

HDPE Electro Fusion Fitting for Water Supply and Drainage Pipe Fittings Accessories

Contact us

Mr. Vic lin: Please feel free to give your inquiry in the form below We will reply you in 24 hours